Cost Effectiveness and Optimal Timing of Crack Sealing in Asphalt Concrete Overlays
Document Type
Article
Publication Date
9-1-2019
Publication Source (Journal or Book title)
Journal of Transportation Engineering, Part B: Pavements
First Page
04019029
Recommended Citation
Mousa, M. R., Elseifi, M. A., Bashar, M. Z., Zhang, Z., Gaspard, K., & Free, K. (2019). Cost Effectiveness and Optimal Timing of Crack Sealing in Asphalt Concrete Overlays. Journal of Transportation Engineering, Part B: Pavements, 145 (3), 04019029. https://doi.org/10.1061/JPEODX.0000133
COinS